Shopping Cart

Home

Lumberyards

Wholesale Distribution

Contact

Login

5-1/4" x 14" LVL 2.1E

5-1/4" x 14" LVL 2.1E

5-1/4" x 14" LVL 2.1E
In Stock — Riverside, CA
$34.34 per linear foot
Bulk Pricing: As low as $28.85
Pieces  
Length  
Riverside Yard Will-Call FREE
Ready on: Calculating...
  • $200 order minimum.
  • Orders placed before noon Pacific Time are ready by 8:00 AM in 2 business days.
Flatbed Site Delivery $295
Arrives on: Calculating...
  • $4,000 order minimum.
  • Available within an 100-mile radius of Riverside.

Dynamic Lumber Solutions
Riverside, CA Distribution

6241 Wilderness Ave
Riverside, CA 92504

Phone Number:
951-900-3758

Will Call Hours:
Mon–Fri, 8:00 AM – 2:00 PM

Bulk purchase pricing

Applies to the entire order (mix & match across all products).

Order total
Your price
$5,000–$12,499
Tier 1 discount
$32.62 / lf
$12,500–$39,999
Tier 2 discount
$31.59 / lf
$40,000+
Best public pricing tier
$28.85 / lf

Dynamic Lumber Solutions
Riverside, CA Distribution

6241 Wilderness Ave
Riverside, CA 92504

Phone Number:
951-900-3758

Will Call Hours:
Mon–Fri, 8:00 AM – 2:00 PM

I-Joists | Rim Board | LVL Beams |

Product Description

5-1/4" x 14" 2.1E LVL Beams are supplied through our Riverside, California wholesale distribution hub for structural floor and header applications across the Inland Empire and Greater Los Angeles. Engineered to a 14" depth, this solid 5-1/4" member aligns with 14" engineered I-joist framing to establish flush ceiling planes. It delivers high load capacity without the jobsite labor of joining individual 1-3/4" plies.

Specifications
  • Width: 5-1/4" (Solid Factory Profile)
  • Depth: 14" (14" I-Joist Depth Match)
  • Modulus of Elasticity: 2.1E
  • Material: Laminated Veneer Lumber (LVL)
  • Adhesive: Exterior technical resins
  • Certification: APA / ICC-ES code compliant member
Common Uses
  • Flush-mount floor girders paired with 14" engineered I-joist floor framing.
  • Heavy window headers and exterior door openings carrying multi-story loads.
  • Dropped header assemblies and stairwell structural openings.
  • Primary load-bearing transfer beams in custom residential framing.
Contractor & Builder Notes
  • 14" I-Joist Alignment: Installs flush with 14" I-joists, eliminating ceiling drop-downs or shimming.
  • Single-Piece Installation: Replaces field-nailed triple 1-3/4" plies, cutting installation time.
  • Direct Substitution: Fully approved code replacement for Weyerhaeuser Microllam®, Boise VERSA-LAM®, and LP SolidStart®.
  • Dimensional Accuracy: Zero camber profile maintains level framing lines for subfloor and drywall alignment.
Sales & Return Policy

Wholesale Hub Terms: Because materials are custom cut and processed to order, transactions operate under strict final-sale terms with no standard returns, credits, or cancellations. Product coverage is limited strictly to transit damage or manufacturing defects that directly compromise structural integrity:

  • Identical Exchanges: Verified structural failures qualify for a 1-for-1 replacement. The original defective material must be returned to our driver at the time of the replacement delivery. Cosmetic variations, sun discoloration, and minor yard weathering do not qualify for claims.
  • 24-Hour Window: Claims must be reported with clear photo verification within 24 hours of delivery.
  • Drop-Zone Rule: To protect against jobsite handling accidents, verification photos must show the material completely untouched in its original drop-zone location as left by our driver, prior to any movement or installation.
▲ Turnkey Framing Spec

180-Day Price Lock Guarantee

We lock your engineered lumber and hardware rates for a full 180 days on officially quoted projects to secure your framing budget against market volatility.

✦ Active Project Takeoffs

Free Quantity Takeoffs

For active projects purchased based off our published pricing, we provide a free quantity takeoff for your hardware and engineered lumber packages. Send us your plans.

Will Call Logistics

  • Hours: Monday through Friday, 8:00 AM to 2:00 PM (Last load initiated by 1:45 PM).
  • Staging: Materials are cleanly banded, staged, and ready for rapid commercial forklift side-loading.
  • Requirements: Transport vehicles, trailers, or racks must be side-loadable. Drivers assume full load securement responsibility before exiting the gate.

Job Site Offloading

  • Rates: We deliver up to a maximum 100-mile driving distance from Riverside for a flat $295 fee.
  • Frictionless Offloading: Arrives via commercial flatbed. Unattended job-site drop-off is fully supported-no unloading labor or framing crew required on-site.

Material List Quotes

  • Have a List? Email it to info@dynamiclumbersolutions.com for wholesale bidding and volume contract discounts.
  • No List? Let us know your project layout and we can assist with quick quantity takeoffs for active builds.